Research Interests:Project Management and Optimization, Emergency Management
Education experience:
From Sep. 1, 2011 to Sep.20, 2017 School of Management, Xi’an Jiaotong University Industrial Engineering Study for Doctor Degree
From Sep. 1, 2006 to Jun.31, 2010 School of Management, Xi'an University of Technology Industrial Engineering Study for Bachelor Degree
Working experience:
From Dec. 13, 2017 to Now School of Management, Xi’an Jiaotong University Assistant Professor
Honors and Awards:
[1] December 8, 2017, "Proactive and Reactive resource-max-NPV Project Scheduling with Random Activity Duration", the first prize in the third Graduate Student Innovation Achievements Exhibition in Shaanxi Province, completed by Zheng Weibo (Instructor: He Zhengwen, Wang Nenmin, Jia Tao) Higher Education Work Committee of the CPC Shaanxi Provincial Committee, Education Department of Shaanxi Province.
[2] March 2019, the "project risk environment proactive/reactive scheduling theory and its applied research" was awarded the first prize for Shaanxi province colleges and universities of science and technology, Shaanxi province education department.
Academic Publications:
[1] Zheng Weibo, He Zhengwen, Wang Nengmin, Jia Tao, Proactive and reactive resource-constrained max-NPV project scheduling with random activity duration, Journal of the Operational Research Society, 2018, 69(1):115-126. (SCI\SSCI)
[2] 郑维博, 何正文, 刘人境, 随机工期下基于可更新资源约束的Max-npv项目鲁棒性调度优化, 管理工程学报, 2017, 31(4): 186-193. (CSSCI)
[3] 何正文, 郑维博, 刘人境, 不同支付条件下银行授信约束折现流项目调度, 系统工程理论与实践, 2016, 36(8): 2013-2023. (CSSCI)
[4] 郑维博, 何正文, 刘人境, 基于融资能力约束的多模式Max_npv项目调度优化:双重视角, 运筹与管理, 2016, 25(1): 25-34. (CSSCI)
[5] 王艳婷, 何正文, 郑维博, 随机动态环境下项目前摄性与反应性调度权衡优化, 工业工程与管理, 2019, 24(4): 88-95. (CSSCI)
[6] 马咏, 何正文, 郑维博, 基于柔性资源约束的前摄性项目调度优化研究, 中国管理科学, 2020, 28(7): 220-230. (CSSCI)
[7] Zheng Weibo, He Yukang, Resource Constrained Project Scheduling Optimization With Robust Objective Under Stochastic Duration Of Activities, the 23rd International Conference on Industrial Engineering and Engineering Management 2016. Wuhan, P.R. China, 2016.09.17-09.18.(EI检索)
Academic Projects
[1] Research on accurate scheduling optimization of public health emergency disposal based on data-driven, National Natural Science Foundation of China, 2021.1~2023.12, in charge, 240000 YUAN, under research.
[2] Lingjie Scheduling Optimization of High-end Equipment Manufacturing Project based on Big Data in Complex Dynamic Environment, General project of National Natural Science Foundation of China (71871176/G0102), 2019.1~2022.12, attended, 480000 YUAN, under research.
[3] Research on Dynamic Equilibrium Scheduling and Optimization of Cash Flow of Large And Complex Engineering Projects under Risk Environment, National Natural Science Foundation of China (71371150/G010301), 2014.1~2017.12, attended, 560000 YUAN, concluded.