[1] Minjing Ning, Zhengwen He, Nengmin Wang, Renjing Liu. Metaheuristic Algorithms for Proactive and Reactive
Project Scheduling to Minimize Contractor’s Cash Flow Gap under Random Activity Duration [J]. IEEE Access, accepted.
(DOI: 10.1109/ACCESS.2018.2828037, IF:3.244).
[2] Minjing Ning, Zhengwen He, Tao Jia, Nengmin Wang. Metaheuristics for multi-mode cash flow balanced project
scheduling with stochastic duration of activities[J]. Automation in Construction, 2017, 81, 224-233.
(DOI: https://doi.org/10.1016/j.autcon.2017.06.011, IF:2.919)
[3] 何正文,宁敏静,徐渝.前摄性及反应性项目调度方法研究综述.运筹与管理,2016,25(5),278-287.
[4] 宁敏静,何正文,刘人境.基于鲁棒性约束的随机活动工期现金流均衡项目调度优化.系统工程,2015,33(9),91-100.
[5] 宁敏静,何正文,刘人境.基于随机活动工期的多模式现金流均衡项目调度优化,运筹与管理.(已录用)
论文题目:随机活动工期下现金流均衡项目调度优化
专业:管理科学与工程
学号:4111008003
公示时间:2018.4.27
公示地点:院图书馆
管理学院教务中心